Background Image
Table of Contents Table of Contents
Previous Page  8 / 170 Next Page
Information
Show Menu
Previous Page 8 / 170 Next Page
Page Background

ASCO CARBON DIOXIDE INC | 5409 Highway Ave. | Jacksonville, FL 32254 | T +1 904 278-6503 |

ascoco2.com

Version 3.3 (02/18)

8

Compact, easy tooperateandmaintain,

ASCO

high performance CO

2

Generators run from

lowsulphur content diesel, kerosene or natural

gas. They are fully automatic and use a low

concentration, aqueous monoethanolamine

solution to efficiently and safely produce high-

est qualitygaseous CO

2

.

ASCO

‘s advanced CO

2

plant designs employ

the latest technology for refined high perfor-

mance, user friendly controls, flexible layout

and ultra-efficient operation. The result is lo-

west possible CO

2

production costs, extended

plant life and minimum environmental effect.

Each plant is dry tested to the fullest extent

possible before despatch. This ensures your

satisfaction - and ours!

ASCO

CO

2

Generators can be engineered to operate from low sulphur content diesel, kerosene or natural gas fuels.

A dual fuel model is also available. This flexibility allows customers to select their most economic fuel. The design

of

ASCO

high performance CO

2

Production Plants has evolved

from over 130 years commercial operation as

a major CO

2

and dry ice equipment producer

. This unique advantage means

ASCO

CO

2

Plants are engineered

with performance and the end user very much in mind.

Plant construction is from carefully selected materials to give a good balance between plant life, performance and

capital cost, i.e. maximum value for money.

ASCO

CO

2

Plants are compact in design and layout to make best use

of space in your factory.

Our skilled and experienced engineers ensure each new

ASCO

CO

2

Plant is correctly installed and commissioned

and operators trained in proper operation and maintenance procedures. A set of comprehensive installation and

operation manuals is supplied to ensure installation as well as future operation and maintenance is carried out

efficiently and correctly.

Cooling System: Optional cooling water recirculation system to handle all the process cooling water.

Plant tools, chemicals and lubricants are available along with CO

2

testing equipment.

CO

2

Production

Utility Consumptions

Capacity

Fuel (diesel)

kg/h (lb/h)

Water

m

3

/h (ft

3

/h)

Power (absorbed)

kW (hp)

Larger capacities

on request

70kg/h (154 lb/h)

24.4 (54)

0.6 (21)

29 (38.89)

160kg/h (352 lb/h

55.8 (123)

1.5 (53)

52 (69.73)

285kg/h (628 lb/h)

99.5 (219)

2.6 (92)

84 (112.65)

500kg/h (1'102 lb/h)

174.5 (384)

4.6 (162)

133 (178.36)

1‘000kg/h (2'205 lb/h)

349.0 (769)

8.7 (307)

241 (323.19)

1'500kg/h (3'307 lb/h)

523.5 (1'154)

12.4 (438)

365 (489.47)

2'000kg/h (4'409 lb/h)

690.0 (1'521)

15.1 (533)

440 (590.05)

ASCO CO

2

Production Plants