Compact, easy tooperateandmaintain,
ASCO
high performance CO
2
Generators run from
lowsulphur content diesel, kerosene or natural
gas. They are fully automatic and use a low
concentration, aqueous monoethanolamine
solution to efficiently and safely produce high-
est qualitygaseous CO
2
.
ASCO
‘s advanced CO
2
plant designs employ
the latest technology for refined high perfor-
mance, user friendly controls, flexible layout
and ultra-efficient operation. The result is lo-
west possible CO
2
production costs, extended
plant life and minimum environmental effect.
Each plant is dry tested to the fullest extent
possible before despatch. This ensures your
satisfaction - and ours!
ASCO
CO
2
Generators can be engineered to operate from low sulphur content diesel, kerosene or natural gas fuels.
A dual fuel model is also available. This flexibility allows customers to select their most economic fuel. The design
of
ASCO
high performance CO
2
Production Plants has evolved
from over 130 years commercial operation as
a major CO
2
and dry ice equipment producer
. This unique advantage means
ASCO
CO
2
Plants are engineered
with performance and the end user very much in mind.
Plant construction is from carefully selected materials to give a good balance between plant life, performance and
capital cost, i.e. maximum value for money.
ASCO
CO
2
Plants are compact in design and layout to make best use
of space in your factory.
Our skilled and experienced engineers ensure each new
ASCO
CO
2
Plant is correctly installed and commissioned
and operators trained in proper operation and maintenance procedures. A set of comprehensive installation and
operation manuals is supplied to ensure installation as well as future operation and maintenance is carried out
efficiently and correctly.
Cooling System: Optional cooling water recirculation system to handle all the process cooling water.
Plant tools, chemicals and lubricants are available along with CO
2
testing equipment.
CO
2
Production
Utility Consumptions
Capacity
Fuel (diesel)
kg/h (lb/h)
Water
m
3
/h (ft
3
/h)
Power (absorbed)
kW (hp)
Larger capacities
on request
70kg/h (154 lb/h)
24.4 (54)
0.6 (21)
29 (38.89)
160kg/h (352 lb/h
55.8 (123)
1.5 (53)
52 (69.73)
285kg/h (628 lb/h)
99.5 (219)
2.6 (92)
84 (112.65)
500kg/h (1'102 lb/h)
174.5 (384)
4.6 (162)
133 (178.36)
1‘000kg/h (2'205 lb/h)
349.0 (769)
8.7 (307)
241 (323.19)
1'500kg/h (3'307 lb/h)
523.5 (1'154)
12.4 (438)
365 (489.47)
2'000kg/h (4'409 lb/h)
690.0 (1'521)
15.1 (533)
440 (590.05)